Pile wall, Kelenföld–Tárnok railway line
muszaki_adatok_cim
Technical data
Building trades
railway and catenary design
bridge and structural design
geotechnics
Principal
DSE Konzorcium
Project value
300.00
Design value
20.00 millió Ft
Years of completion
2012 to 2013
Years of construction
2012 to 2013
In connection with the reconstruction of the Kelenföld–Tárnok railway line, it was necessary to shore a cut between chainages 208+97.60 and 217+81.65 m next to the left track due to the construction of the new track and the little space available. The DSE Consortium commissioned our Company to design a nearly 900 m long, 6.5 to 8.0 m high pile wall used for shoring the cut.